US Army: sUAS Manufacturing Rodeo, commercial solutions opening
- Region
- United States
- Stage
- Special notice, commercial solutions opening
- Source status
- Official record
Maximum $3,000 cost per unit for the Group 1 FPV one-way attack platform (the notice’s cap)
- Event
- Army Contracting Command, Detroit Arsenal posted SAM.gov special notice W911RQ-27-S-C002 announcing a commercial solutions opening for an sUAS Manufacturing Rodeo. The notice says the Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology), with Army Materiel Command and the contracting command, is launching the sUAS portion of supply chain stress testing as the baseline for the Army’s “inaugural Manufacturing Rodeo”. The stated goal is a “cooperative hybrid manufacturing framework” that pairs the Army’s organic industrial base with commercial firms. The notice states that the cost of the Group 1 FPV one-way attack platform “is strictly restricted to a maximum of $3,000 per unit”, checked through a full bill of materials. Selected performers receive depot-made battery packs, motors and frame kits as government furnished equipment. Each is to produce 400 flight-ready one-way attack aircraft and 20 ground control station units by 1 March 2027, with a share delivered early, on 15 February 2027, for testing and operator training. The systems then compete in a dedicated category at Drone Dominance Gauntlet III, which the notice gives as “scheduled for March 2027”. Successful performers “will unlock priced contractual options for scaled production (up to 10,000 aircraft)”, with assembly moving to shared lines inside Army depots. Systems must conform to the Drone Dominance Supply Chain Framework, which the notice calls “more restrictive than the NDAA”. This is a notice of an opening; nothing has been awarded. The notice text does not say how many performers will be selected and gives no total value. Edition 2 recorded the Drone Dominance Program Phase III request for solutions, which estimated Gauntlet III for March 2027.
- Date
- Notice posted 13 November 2026; virtual industry day set for 16 November 2026; responses due 20 November 2026.
- Source
- SAM.gov special notice W911RQ-27-S-C002, Army Contracting Command, Detroit Arsenal, 13 November 2026. The entry rests on the notice text; the commercial solutions opening document attached to the notice was not read.
- What it indicates
- The Army is tying a Drone Dominance competition category to production in its own depots, with a unit cost cap stated in an official record. The 400 aircraft are per selected performer and the larger quantity is an option, so the notice sets no total buy.
- Next stated milestone
- Responses due 20 November 2026; a share of the batch delivered early, on 15 February 2027, and the full batch by 1 March 2027; systems compete at Drone Dominance Gauntlet III, scheduled for March 2027 (SAM.gov special notice W911RQ-27-S-C002).
Tracked in: US Drone Dominance Program